List of Awarded PPP Projects 2015

According to ppp.gov.ph , the Philippine government has recently awarded PPP projects 2015 to qualified bidders.

Here is the list for Public-Private Partnership Projects 2015 as of March:

PPP Projects 2015 - Daang Hari-SLEX
1)   Daang Hari-SLEX Link Road Project
Private proponent/ Bidder: Ayala Corporation

Classification: Build-Transfer-and-Operate (BTO) 30 years

Cost: Php 2.22 Billion

Project Details:

  • Construction of a new 4-kilometer 4-lane toll road, from the junction of Daang Reyna and DaangHari in Las Piñas/Bacoor, Cavite to SLEX through the Susana Heights Interchange in Muntinlupa, traversing the New Bilibid Prison (NBP) Reservation.
  • The proposed link-road will use the Susana Heights Interchange as exit and entry from north and south of SLEX and will include the construction of a new bridge/widening of the existing bridge crossing SLEX as well as the expansion of the Susana Heights toll plaza.

PPP Projects 2015 - NAIA Expressway

2)   NAIA Expressway Project (Phase II)

Private proponent/ Bidder: Vertex Tollways Development, Inc. (San Miguel Corporation)

Classification: Build-Transfer-and-Operate (BTO) 30 years

Cost: Php 23.90 Billion

Project Details:

  • The project is a 4-lane, 7.75 km elevated expressway and 2.22 km at-grade feeder road that will provide access to NAIA Terminals I, II and III, and link the Skyway and the Manila-Cavite Toll Expressway.
  • It starts at the existing Skyway then follows the existing road alignments over Sales Avenue, Andrews Avenue, Domestic Road, and NAIA Road, and has entry/exit ramps at Roxas Boulevard, Macapagal Boulevard, and PAGCOR City.
  • The project involves: a) construction of Phase II; b) construction of at-grade feeder roads leading to/from PAGCOR Entertainment City; and c) operation and maintenance of the expressway.

PPP Projects 2015 - LRT 1 Extension

3)   LRT Line 1 Cavite Extension and Operation & Maintenance

Private proponent/ Bidder: Light Rail Manila Consortium (LRMC)

Classification: Build-Transfer-and-Operate (BTO) 32 years inclusive of construction period

Cost: Php 44.65 Billion

Project Details:

  • The current LRT Line 1 will be extended starting from its existing Baclaran Station to the future Niyog Station in Bacoor, Cavite which is approximately 11.7 kilometers. Of this length, 10.5 kilometers will be elevated and 1.2 kilometers will be at-grade.
  • The whole stretch of the integrated LRT 1 will have a total length of approximately 32.4 kilometers and will be operated and maintained by the private proponent.
  • The private partner will undertake the design, construction, and financing of the Cavite Extension as well as the operation and maintenance of the integrated system upon completion of the project.
  • The concessionaire will also undertake future system maintenance and upgrades as well as permitted commercial development.

Here’s the status quo of Public-Private Partnership Projects 2015 as of march 2015.

Public-Private Partnership Projects 2015

Other Public-Private Partnership Projects 2015 for bidding are the following:

NLEX-SLEX Connector Road (Php 25.6 Billion)

North-South Railway Project – South Line (Php 177.215 Billion)

For rebidding:

Cavite-Laguna Expressway – CALAX (Php 35.4 Billion)

PPP Projects 2015 for approval are:

Makati-Pasay-Taguig Mass Transit System Loop (Php 374.5 Billion)

LRT Line 6 Project (Php 64 Billion)

 

Related topics for this article: "list of ppp projects philippines"

Comments

comments

Leave a Reply

Your email address will not be published. Required fields are marked *